Ballantyne Street, Thebarton upgrade

Share Ballantyne Street, Thebarton upgrade on Facebook Share Ballantyne Street, Thebarton upgrade on Twitter Share Ballantyne Street, Thebarton upgrade on Linkedin Email Ballantyne Street, Thebarton upgrade link

Consultation has concluded

Due to the poor condition of the road pavement, kerbing and footpath, the City of West Torrens has scheduled the upgrade of Ballantyne Street, Thebarton between Dew Street and South Road.

The road design process has commenced and we are seeking the feedback from the community on the attached concept plan which has been developed.

Currently, the road presents a number of issues including a narrow carriageway, narrow footpaths on either side of the road and limited opportunities for appropriate tree planting. It is also noted that the existing road arrangement causes conflict between permitted on-street parking and driveway accesses, particularly to properties on the northern side of the road.

If the design of the road was to remain as it is currently presented, it is likely that future parking exclusions would be required along the full length of the street to assist with accessing driveways.

The road design concept plan includes:

  • A single uninterrupted traffic lane
  • Indented parking bays (24 in total) evenly distributed along the southern side of the road. The existing formal footpath on the southern side of the road will be removed to accommodate this.
  • New brick paved footpath along the northern side of the road providing a wider and improved amenity.
  • Establishing of a substantial number of new street trees along the length of the project and on both sides of the road including:
    - 15 existing trees to be removed (of various sizes)
    - 7 existing trees to be retained
    - 75 new trees to be planted
  • Allocated locations for bin placement, to minimise impact on on-street parking on bin day.

There is currently sections of kerbing formed using slate as was common during early years of road construction. There is the intent within the project to carefully remove and recover this material and return it into the proposed new road design as a feature strip within the verge on the northern side of the road.

Based on community acceptance of the proposed road design, further communication on the tree species proposed will be sent to the community.


How to have your say

Provide your feedback using any of the following:

  • use the submission form at the bottom of this page

  • prepare a written submission and mail to:
    Ballantyne Street upgrade consultation
    City of West Torrens
    165 Sir Donald Bradman Drive
    Hilton 5033

  • email csu@wtcc.sa.gov.au with the subject heading 'Ballantyne Street upgrade consultation'.


All responses must be received by 5pm Monday 26 October 2020. Once results have been compiled, we will then progress with finalising the road design.

If you require further information, please contact Ben Bai, Asset and Project Engineer, via email at bbai@wtcc.sa.gov.au or phone 08 8416 6323.


Due to the poor condition of the road pavement, kerbing and footpath, the City of West Torrens has scheduled the upgrade of Ballantyne Street, Thebarton between Dew Street and South Road.

The road design process has commenced and we are seeking the feedback from the community on the attached concept plan which has been developed.

Currently, the road presents a number of issues including a narrow carriageway, narrow footpaths on either side of the road and limited opportunities for appropriate tree planting. It is also noted that the existing road arrangement causes conflict between permitted on-street parking and driveway accesses, particularly to properties on the northern side of the road.

If the design of the road was to remain as it is currently presented, it is likely that future parking exclusions would be required along the full length of the street to assist with accessing driveways.

The road design concept plan includes:

  • A single uninterrupted traffic lane
  • Indented parking bays (24 in total) evenly distributed along the southern side of the road. The existing formal footpath on the southern side of the road will be removed to accommodate this.
  • New brick paved footpath along the northern side of the road providing a wider and improved amenity.
  • Establishing of a substantial number of new street trees along the length of the project and on both sides of the road including:
    - 15 existing trees to be removed (of various sizes)
    - 7 existing trees to be retained
    - 75 new trees to be planted
  • Allocated locations for bin placement, to minimise impact on on-street parking on bin day.

There is currently sections of kerbing formed using slate as was common during early years of road construction. There is the intent within the project to carefully remove and recover this material and return it into the proposed new road design as a feature strip within the verge on the northern side of the road.

Based on community acceptance of the proposed road design, further communication on the tree species proposed will be sent to the community.


How to have your say

Provide your feedback using any of the following:

  • use the submission form at the bottom of this page

  • prepare a written submission and mail to:
    Ballantyne Street upgrade consultation
    City of West Torrens
    165 Sir Donald Bradman Drive
    Hilton 5033

  • email csu@wtcc.sa.gov.au with the subject heading 'Ballantyne Street upgrade consultation'.


All responses must be received by 5pm Monday 26 October 2020. Once results have been compiled, we will then progress with finalising the road design.

If you require further information, please contact Ben Bai, Asset and Project Engineer, via email at bbai@wtcc.sa.gov.au or phone 08 8416 6323.


  • CLOSED: This survey has concluded.

    The City of West Torrens is proposing to undertake the road upgrade of Ballantyne Street, Thebarton between Dew Street and South Road as part of its 2020/2021 Capital Works Program. 

    Your ideas and feedback are important to us and the results of this survey, along with our research and targeted consultation, will help inform the final upgrade design. If the survey has closed and you'd like to ask a question, provide comments or ideas, you can still do so by via the Questions tab, or by emailing bbai@wtcc.sa.gov.au 

    Consultation has concluded
    Share Submission form closed on Facebook Share Submission form closed on Twitter Share Submission form closed on Linkedin Email Submission form closed link